Steel Turned Parts

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2022-01-19 21:38

  • Browse the number:

    447

Send an inquiries

Company Profile

CJ Metal Parts Ltd

By certification [File Integrity]

Contact:kenxin123(Mr.)  

Email:

Telephone:

Phone:

Area:Beijing

Address:Beijing

Website:http://www.cjmetalparts.com/ http://kenxin123.hedtx.com/

Product details

Product detail for steel turned parts:


Material Capabilities: Aluminum alloy, Brass alloy, Bronze, Copper, Plastic, Stainless Steel, Steel Alloys

Surface finish: see below form

Requirements: No burrs, scratches, dents.
Tolerance: +/-0.01mm to +/-0.005mm

Samples: Yes

Process: Cnc Machining and turning - deburrs - surface finishing - cleaning - inspecting before shipment- packing

Package: Blister/tray packing, bulk packing

Delivery time: 5-10days for samples, 15-25days for mass production


Brand Name: CJ Metal Parts

Belongs to: CNC turning parts, cnc machining parts

Place of Origin: Guangdong, China

Size: Customized designs are welcome

Equipment: 3/4/5 Axis Center Machining


Surface finish available:

Aluminum parts

Stainless Steel parts

Steel parts

Brass parts

Clear Anodized

Polishing

Zinc plating

Nickel plating

Color Anodized

Passivating

Nickel plating

chrome plating

Sandblast Anodized

Sandblasting

Chrome plating

Electrophoresis black

Polishing

Laser engraving

Oxide black

Oxide black

Brushing

Electrophoresis black

Carburized

Powder coated

Chroming

Oxide black

Heat treatment


Chemical Film


Powder Coated





CNC machining Workshop:

Production method: Automatic lathing, CNC lathing , CNC milling, CNC drilling, CNC boring, CNC grinding
Production equipment list: 15 precision CNC lathing, 10 precision CNC milling, 30 other machines

Production capacity
Tolerance: +/-0.001mm
Environmental requirement: RoHs
Lead time: 7-35days




Our quality control Equipment:


2D coordinator

Hardness tester

Projector

salt spray testing


Package before shipment:



FAQ:

1. How long can I get the quotation?

A: We will give you the quotation within 48 hours(Considering the time difference).


2. How do you control the quality?

We have stric quality control from the begining of project, such as incoming inspecting, first article inspecting, we control quality by IQC and IPQC during production process, and we will 100% inspect the goods before shipment.


3. Is it safe to send my drawings to you?Will you give away the secrets of my design?

Yes, we can sign the NDA in advance, before you send the drawings.


http://www.cjmetalparts.com/